News & Updates
Silver Strike Concrete Ready-Mix Plant Now Open: Servicing Greater Reno, NV Area
Silver Strike Concrete is now open and batching concrete at our brand-new Lockwood location! The new plant was built from the ground up, taking about 6 months to design, build, install, and configure from start to finish. It is more than capable of loading over 120...
Echo Water Treatment Facility
This project is touted to be the biggest public works project in Sacramento’s history. It involves the upgrade of the existing Sacramento Regional Wastewater Treatment Plant. For this project we incorporated an on-site portable batch plant, water containment...
Shasta County Courthouse
The design and construction of the new Redding courthouse building consists of six stories above ground and a basement level with 14 courtrooms for a total of 166,887 building gross square feet. The technical concrete applications involved in this project included...
Walerga Bridge Replacement
This project was developed to replace the existing bridge with a new bridge approximately 101 ft wide and 514 ft long, accommodating four 12-ft lanes, two 4-ft shoulders, a variable width median, a 12-ft Class 1 Bikeway, and an 8-ft walkway. For this project we...